Migration · By Rivtor · Updated
Move FastAPI from a VPS to managed hosting
Moving FastAPI from a VPS means replacing operating-system assumptions with explicit application services, private configuration and durable data interfaces. Inventory system services, filesystem paths, proxy rules and scheduled work before rehearsing the destination.
Compare Rivtor plans for your workload →
Find assumptions outside the repository
Read the current process-manager definition and deployment instructions. A VPS may contain manually installed system packages, a local PostgreSQL socket, an nginx route, a cron job and files under an absolute directory. Those dependencies can be invisible in a Git repository.
Record package names and configuration boundaries without copying secrets. Check user permissions, Python version, native libraries and any subprocess the API launches. A pip requirements file alone cannot recreate an operating-system dependency.
Replace local resources deliberately
| VPS assumption | Managed-hosting decision |
|---|---|
| Local database socket | Supported network database connection |
| Uploaded files on disk | Durable object storage or supported persistence |
| systemd worker | Separate supervised worker service |
| nginx rewrite | Explicit public routing and application root path |
| cron entry | Verified scheduler or external scheduled trigger |
Do not assume every destination offers a scheduler or persistent volume. Retain an external service or choose a compatible design when the requirement is unsupported. A Dockerfile can package system libraries, but it does not automatically move database state or disk files.
Rehearse the complete runtime
Build a disposable destination with synthetic data. Start FastAPI with the intended ASGI command and service root. Check redirects behind the public proxy, static assets if any, and a database-backed request. Configure CORS only for actual browser origins.
For Rivtor, inspect supported Python and Docker workflows. Verify how any database import or private operator connection is performed before scheduling a move. Keep secrets in the documented environment workflow.
Cut over with a state checklist
Freeze writes when taking the final database and file snapshot. Include workers and scheduled jobs, not only browser traffic. Validate restored records and object references before changing the hostname. Test a synthetic user journey after the switch.
Keep the VPS available during acceptance, but avoid two active consumers processing the same queue accidentally. Once the new system accepts writes, a rollback needs an explicit reconciliation plan. Document what remains on the VPS so a later shutdown cannot remove a forgotten service.